Councilmembers UI + Greens have warned of irreparable harm that can result in the route of the AVE project passing through Totana, which strangle the possibility of building a freight terminal in the Iron Aceña, connected with the industrial and the Future City Transport, which is intended to be Intermodal.
The project, located the two-way high-speed rail between the current and the Industrial Park and the area proposed for the City Transport.
"When designing the bridge that eliminates the current level crossing, to connect to the N-340, appears the story of building an insurmountable barrier between the current track and the Complex, which would defeat the Freight Terminal rail, which the City and employers have struggled with for years ... "said Councilman IU + Greens in Totana, Juan José Canovas.
The deputies of the Left, proposed creating a committee composed of political parties, trade unions and employers to require the change of project promotion and burying of the AVE tracks, which the municipality totanero, no direct benefit is you can eliminate all possibilities for future growth and employment generation, around the freight terminal and the growth of the polygon, connected to conventional rail.
They also warn, the councilors of IU, on the condition that is the slums (Tirol Camilleri, Triptolemos, The Season Pears, when building an insurmountable barrier, to strangle its growth and opportunities in the industrial zone Lebor hamlet.
Source: IU + Los Verdes Totana