The City Council of Totana, through the Local Government Board, has approved the technical project prepared for the implementation of the pavement strengthening works of the Milky Way's new in the section between the Bridge and the River Road filter, referred to in the POS 2008, for an amount of 56,884.44 euros.
The approval of the project was carried out with the authorization of the Directorate General of Local Government, to engage the work of the Works and Services Plan for the year 2008, and taking into account that the financing of these works are performed with input Ministry of Public Administration (27,304.53 euros), the Autonomous Community (23,891.47 euros) and the city of Totana (5688.44 euros).
The bill defines, quantifies and values the work required to strengthen the firm this way: the section to reinforce with a length of 1,100 m, ranging between Guadalentín River bridge, until it crosses the path of municipal sewage, the road is known as the Milky Way of New York.
The description of the work to be done to the adequacy of the road has a width of 5.75 meters, 5.75 to 1 meter carriageway and hard shoulder, in order to ensure the safety and comfort of use of the Milky Way New by their users.
The performance will include signaling through road markings and the corresponding vertical signal.
Source: Ayuntamiento de Totana