The Municipal Water Totana, in its strategic plan to optimize the drinking water, has scheduled a campaign this month leak detection in all lines the village in order to increase performance of the service, in order to reduce losses in the supply.
The work aimed at improving the performance of networks are made delimiting different areas of town and inspecting the pipes that make up the drinking water of the town, since all drinking water village is supplied with tanks San Joseph and the florets.
These tasks allow troubleshooting act on it immediately after the field work being conducted by the staff of the Water and the company that is doing the work "Von Roll Hydro" conclusion.
This company has been commissioned to design a specific work plan for Totana, using the latest technologies that can be found in the market, according to sources from the Department of Services.
The work consists of the installation of acoustic prelocalizadores on water pipes they hear noises and stored overnight to then be treated by a computer program and obtain a possible leak area.
Also during the day the correlators triangulate distances and locate the exact location of the leak, and when this is not possible, as a last resort would be to listen directly on the ground by using geophones.
Service technicians predict will be very fruitful and predict that once corrected faults may be recovered, depending on the supply industry, a significant percentage of the amount of water provided to supply the village shows the same sources.
Source: Ayuntamiento de Totana