Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

IU Totana claim that "the PP government wants to give the lace to the Tajo Segura" (12/09/2013)

The Plan is currently in a period of claims and has raised many reactions, most contrary to that plan.

The main reason put forward various organizations to reject such a proposal has to do with the proposed increase for the strategic reserve in header, currently 240 hm3 and proposed increase to 400Hm3en Entrepeñas reservoirs and Buendia.

Regarding the necessary continuity of Diversion Tagus, IU-Green has maintained a historical position that emerges from the analysis of the socio-economic needs of the region.

Our position has also avoided demagogic maximalist positions and do not contribute to finding solutions.

We believe that the main problem regarding the proposed Plan Tagus lies not in the existence of a reservation header, or in determining environmental flows for rivers in the basin, but at the risk of carrying out a water planning " part "for you determine pressures, which obviates the needs of some territories to those of others.

Regarding the size of the reserve in header IU-Green argues that this determination should be made from technical and political criteria, at the same time considering the large variations in the availability of resources as a result of varying rainfall of the basin.

SET A RESERVE VOLUME WATERPROOF 400 HM3, BY PRESSURE OF AFFECTED MAY RESULT nonsense HOW COULD NOT FOR HUMAN USE transfer water DROUGHT IN TIME, OR THAT THE MAXIMUM VOLUME IS transferable GIVE IN MINOR PERIODS NEED.

Is the National Government who has the responsibility to promote the harmonization of the interests of all affected regions and who must ensure that all regions of Spain there is enough water for human consumption and the real economy, not the speculative economy while safeguarding the sustainability of water harvesting.

No doubt this "equation" is difficult, but we give ourselves citizens rulers to assume such responsibilities and not to do dereliction of duties while producing regrettable episodes of confrontation between regions.

The State Government has the responsibility and obligation to propose measures to harmonize the interests of all the regions of Spain.

Tagus The new plan, according to its current, largely obvious needs of the Region of Murcia, so you should join it guarantees the necessary continuity of the Tajo-Segura.

Source: IU-verdes Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.