The mayor of Infrastructure of the City of Totana, María José Bedia, explained that the refurbishment of the RM-315 highway, which links the town with the hamlet of El Paretón, are well advanced.
Bedia, who recalled that these works are carried out by the Highways Agency has indicated that the works are close to 600,000 euros investment and result in improved driving more than 5 kilometers included in the project.
The mayor said that "after the launch of the highway between Mazarrón and Totana, this road has been a sharp increase in the number of drivers who travel to and from the Paretón," so this preparation "improves the road network in the environment. "
Specifically, they are carrying out work for the resurfacing of the road and improving access to housing on both sides of the road.
In addition, improve visibility and drainage, facilitating the circulation in case of rain and the conservation of the road.
Bedia also said it carried out the renewal of all signage in the area "to ensure a smooth flow with minimal risk."
It will also contribute to the installation of barriers to protect motorists.
Source: Ayuntamiento de Totana