Also conditioned access to adjoining buildings, and renewed the drainage system and install barriers to protect motorists in the curved sections
The Ministry of Public Works, through the Directorate General of Highways, has begun work on improving the road to El Paretón, RM-315, which connects Mazarrón and Totana.
This route gives drivers traveling through this area of ​​the Bajo Guadalentín an alternative route to the RM-3 motorway from Totana and the said parish.
The Director of Roads, Jose Guijarro, said that "the replacement of the firm will seek a better grip of the road vehicles, which will facilitate the conduct and allow a more comfortable ride."
Also, both the people living in this parish and throughout the area covered by this performance will be improved access to their dwellings and adjoining properties, as it will increase the visibility at the entrance and exit of vehicles to the road.
Similarly, will be the renovation of the drainage system "that will provide greater traffic safety in case of rain," said the CEO.
Signaling also renewed, will be placed for marking and barriers installed to protect motorists in areas of curves.
Another of the activities planned is the elevation of the joint board Guadalentín River Bridge.
"This is an action which makes an investment of 575,000 euros and that it seeks a safer driving conditions on the 600,000 recorded journeys a year this way," concluded Jose Guijarro.
Source: CARM. Foto: AT