Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

Begin construction of the Municipal School Parents and the covering of the arena of CP "Santa Eulalia" (04/08/2010)

The construction of the municipal building for the School of Parents and reform of toilets and the covering of the arena of the school "Santa Eulalia" and the construction of the municipal building for summer schools and the reform of toilets CP " Tierno Galván "in the town have started running this week, as reported by the Councillor for Sustainable Planning and De Maria José Bedia.

The commercial "PROMOVALCI 2005 SL is the contractor of the two school plays" Santa Eulalia ", in an amount of around one million euros.

Specifically, the construction of the municipal building for the School of Parents and reform of toilets, have a budget of 327,700 euros to 201,787 euros improvements and implementation within three months, so that after the summer and be completed the next school year 2010-11 will be fully operational.

On the other hand, the covering of the works of the college sports track "Santa Eulalia" are priced at 218,950 euros award, in addition to the improvement of 93,210 euros.

With the construction of the building of new plant to the Parents' School, which will be located next to the school, as reported by the mayor, will respond to the demand made by a large proportion of the population of Totana, which been requesting a municipal building for this use, as "a meeting place through dialogue and analysis we try to share different views on topics of educational interest."

Thus, the school aims to provide ground floor of rooms for administrative and rearrangement of toilets, with direct access from the outside and adapted to persons with disabilities engines.

On the other hand, the projected construction of 720 meters, to be carried out within the precincts of the school "Santa Eulalia" on the existing outdoor sports court, is located on Calle Teniente Pérez Redondo at the corner of Calle Virgen Mercy.

The works, as explained Councillor for Planning and Sustainable Development, María José Bedia, include the construction of a metal roof rolled steel pillars in the existing sports center.

This is a new plant construction to safeguard school children in this school of inclement weather in both winter periods and in the summer.

This reform, as reported by the mayor, involves modification of the current fencing school, and the reorganization of sports courts, distributing an inside under cover and another was discovered.

On the other hand, the construction of the municipal building for summer schools and the reform of toilets CP "Tierno Galván" in the town are being implemented by the Commercial UTE "Bachelor SL Components" and "Transfer Building 97 SL.

The amount of the award of this work, financed through the State Fund for Employment Promotion and Sustainability Local 2010, which will allow the hiring of 100 people, of which 25 are unemployed, with the improvements offered by the company exceed 700,000 euros.

Summer School

With the construction of the building of new plant to the Summer School, which will be located next to the school, as reported by the mayor, will address the commitment made by the government team with the educational community of this center who came seeking a building for this use.

The planned construction will take place within the precincts of the CP "Tierno Galván", on the field of educational equipment located at the corner of San Antonio Street Bullas, in the district of Parral.

The place where it will build the new plant is building on areas of current playground, and the entire building will be screened on the upper floor on stilts to avoid crowding patios, except for access to it.

The infrastructure for the Summer Schools, as explained María José Bedia, is for educational use and municipal responsibility to respond to the widespread demand that currently exists in the municipality.

Also, the building will contact the school through the floor to share the existing lift and included in the same toilets affected reform, and incorporating toilets adapted for people with physical disabilities.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.