The Local Government Board has recently approved the catalog of several rural roads for submission to the General Directorate of Rural Development of the Ministry of Water, Agriculture and Environment for the settlement of three rural roads within the next call for aid to conditioning of rural roads.
Municipal technicians have undertaken the development of a catalog of municipal rural roads likely to benefit from such aid, in which its length, width and type of current firm is collected.
The inclusion of roads in this call are the Way of the nacelle (1.6 kilometers), the road behind COATO to Camino Juan Teresa (0.3 km) and road from the RM-609 to the House of Trini ( 1.4 kilometers).
The first path connects the Hondales with secondary roads;
the second connects the Agricultural Cooperative of Totana with the Way of Teresa and John Cena third RM-609 connects the road with the House of Trini.
The first deputy mayor and councilor of Roads, Andrés García, explained that this proposal was made in order that the Consistory totanero qualifies for the call 1/2016 of conditioning aid to rural roads, which we hope has the approval of the Autonomous Community to proceed with the settlement.
Source: Ayuntamiento de Totana