The Department of Urbanism and Services informs that on Wednesday, November 25, 2020, the works will begin to install the Sewer Network Section in Juan XXIII Street in this town, which will force the cut off of traffic on this road and adjacent streets during the job execution time.Citizens are informed of alternative detours for the works as shown in the image.By resolution of the Mayor's Office, the emergency procedure for the contracting of this work has recently been declared as a result of a breakdown in the existing section of this street, which has been awarded to the company “Auxiliares Hermón SL”, with a budget of 46,739, 80 euros.The action will be carried out after the detection of a fault during the works of the installation of a connection in Calle Juan XXIII, where it was observed that the general sanitation pipeline, which runs from Cafetería Miami to the intersection between C / José Antonio, Juan XXII and Presbítero Ramírez have a serious problem due to a broken tube in this section. The technicians of the Department of Urbanism and Services understand that it is an exceptional situation in the incidence detected, which poses a serious danger to private (residential building) and public (urban road) properties.The works on the sanitation network will consist of the installation of the section of the sanitation network in PVC pipe SN4 with a diameter of 400 mm and its connection to wells to be executed; as well as the complete installation of reinforced concrete manholes with a ductile iron cover and manholes, as well as the cancellation of branches of the existing pipeline.
Also, caving will be carried out in the area affected by the infiltration of wastewater with gravacement.
Source: Ayuntamiento de Totana