PROINVITOSA has prepared projects for the implementation of other two classes of four ships each
The Municipal Development and Land Industrial, SA (PROINVITOSA) Totana City Council has awarded the four industrial buildings built on a plot of the fourth phase of the Industrial Park "The Salad" totaneras and three companies from outside the locality .
In these vessels, as reported by the Councillor for Economic Development and Industry, José Antonio Valverde Queen, the winning companies are carrying out the installation of measures such as stockpiling and trade of furniture and household equipment, machine shop Overall, import and distribution of lighting equipment and collection and storage of vehicles with cranes and roadside assistance.
The provision of entrepreneurs such vessels has been produced by the sale of the same in two cases and through hire-purchase option on the other two cases, taking into account the needs expressed by these entrepreneurs.
Prices, both sales and rental services, and the characteristics and conditions of these industrial units have been very successful for these small businesses or starting a new business and do not need to expand and improve with, as noted by the mayor .
On the other hand, Valverde Queen has announced that PROINVITOSA has prepared projects for the implementation of other two classes of 4 ships each, also located in the Industrial Park Phase IV, features and dimensions similar to those sold.
For the adjudication process, the mayor noted that the same conditions apply, as in it.
Source: Ayuntamiento de Totana