Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The Session adopted a series of guidelines to improve the General Plan document Municipal Urban Planning of the town of Totana (30/05/2008)

The Town Planning, Juan Carrion Tudela, has reported several issues recently agreed by the Local Government Board, to improve the General Plan document Municipal Urban Planning of the Municipality of Totana.

The mayor recalled that last April 18 was approved by the full City Council, the document partial modification of the General Plan of Urban Planning of Totana provisional approval of January 23, 2007.

This document was subject to public information by a notice in the Official Gazette of the Region, and published in two newspapers of major regional distribution for the submission of claims.

During the current period of public exhibition will remain open until 10 d ejunio so that residents can make representations they deem appropriate for improving the document, and after holding separate meetings with local residents, explained the mayor, have detected some specific areas whose content needs to be rectified.

Guidelines:

These arrangements were agreed to remove the vial channel projected onto the Tajo-Segura full width of the municipality.

It also agreed to maintain the action units of urban land contained in the PGMO, consolidation criteria of the standard form subsidiaries to remain a consolidated urban land and the land they were in the planning.

With regard to Alternative West, reconsider the current route of the communication channel, so as to minimize as far as possible the condition it currently does to existing buildings.

Also, will join the list of public roads that do not show those signs contrary to such inclusion, either having interrupted the passage or inner being of the farm roads or easements be mere one to another farm.

On the other hand, will be incorporated in the PGMO documentation, the necessary decisions for General Systems and the Communications Infrastructure and Services contained in the graphic documentation of PGMO be considered as locations and / or paths indicative and not binding , referring the PGMO for specific location of the General Plans for Infrastructure currently being drafted.

Also included in the PGMO regulations necessary determinations for all the urban area of Paretón buildings may be constructed of a plant.

Finally, with regard to the activities permitted in Rotational plots, then proceed to study the legal viability of that in plots dotacionales whose collection is foreseen in the PGMO, will be granted building permits and business licenses for uses other than dotacional , until its acquisition by the City.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.