Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The Department of Infrastructure is carrying out works of removal and capping of the irrigation pipes in the Way of the Mills (24/05/2012)

Workers of the Department of Infrastructure are undertaking works for disposal and capping the pipe irrigation tube that surrounded the shoulders of the Camino de Los Molinos, which posed a serious danger for drivers and had caused damage to neighboring residents in this area the council of La Huerta.

The actions are performed in the known curve Luis Perez, on both sides of the track, with a length of about 200 meters.

The works are undertaken on a section whose infrastructure was uncovered or sticking with the consequent danger that could lead to driving, and is also close to the Way of the turret.

This demand had made the mayor pedánea, Mari Carmen Tapia, and the inhabitants of La Huerta in the various meetings held with municipal officials.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.