Workers of the Department of Infrastructure are undertaking works for disposal and capping the pipe irrigation tube that surrounded the shoulders of the Camino de Los Molinos, which posed a serious danger for drivers and had caused damage to neighboring residents in this area the council of La Huerta.
The actions are performed in the known curve Luis Perez, on both sides of the track, with a length of about 200 meters.
The works are undertaken on a section whose infrastructure was uncovered or sticking with the consequent danger that could lead to driving, and is also close to the Way of the turret.
This demand had made the mayor pedánea, Mari Carmen Tapia, and the inhabitants of La Huerta in the various meetings held with municipal officials.
Source: Ayuntamiento de Totana