Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The full council approved, unanimously and archived, the definitive establishment of a model city and regional planning (29/12/2011)

The full City Council today approved Totana, unanimously at the last regular meeting of the year for the month of December, the definitive establishment of the spatial model of the Municipal General Management Plan (PGMO) Totana, has been collected in a joint proposal by the three municipal groups represented.

A joint committee work, composed of the three political groups, municipal and professional organizations and business involved Cebag AEMC and has been working on this proposal since the beginning of this term to define a consensual model for planned urban development coming years.

The arrangements proposed by the political and business leaders on general planning concern, in general, the guidelines relating to urban land Totana, urban land in the hamlet Paretón-Cantareros The other villages, undeveloped land and soil developable, and the parameters in respect of areas of economic activities.

The guidelines relating to urban land reflects the legislation Totana heights, green areas, residential growth and other issues related to the treatment of urban avenue in the future ring road west and building typologies sovereign flexibility in other areas of town.

On the main municipal district, El-Cantareros Paretón, fixed model, in general, maintenance of management raised by the amendment number 33 of the subsidiary rule, limited to two lower-deck heights, developing Complete Infrastructure Plan for the county council and the establishment of a management unconsolidated areas through the establishment of units of action.

In relation to rural communities, agreed to establish the possibility of expanding urban development, as a belt around the rural villages taking advantage of infrastructure already in place, where housing construction permit.

Similarly, in the districts most important (and the Lebor Raiguero), be allowed a reservation of land for development without sectorize to allow, if necessary and just as true for Totana and the core of the Paretón, a reservation of land for development without sectorize which, in case it was necessary, planned growth of the same by progressive sectorisations connected with the urban fabric.

Maintaining the historical undeveloped land

The corporations also agreed to maintain the existing urban historical trajectory which traditionally refers to undeveloped land, proposing an improvement that is compatible with the environment, which means respect the character of protected natural areas integrated in the Natura 2000 (Sierra Espuña Saladares Guadalentín and Sierra de La Tercia) and public forests, which account for 50% of the total territory.

The proposal calls for encouraging the establishment of tourism infrastructure and services that bring value to the strategic location of Totana (between Sierra Espuña and the coast), recognize the protected nature of the irrigated area of ​​Diversion located between the motorway A-7 and Guadalentín river for its agricultural values ​​and undeveloped land classified as unsuitable for developing the ground located south of the river.

Rules for building land

The development model proposed residential development avoids building land in protected areas like the Sierra Espuña perimeter, area of ​​orchards, irrigated Transfer spaces, spaces near SPAs and other protections.

It also provides a reserve of land for development beyond the existing railway line and towards the highway to the town center has space to grow in the coming decades.

Also allow residential growth areas in the north and south of the town of El Paretón.

This catalog are maintained sites of urban orchards, Breeches, all transfers and Molejon area, Stables, Santa Leocadia and Purgatory, La Huerta, dry, and Vinas-Carivete northern areas of the municipality classified as developable land in PGMO provisional approval, except the area of ​​Llano de las Cabras.

Guidelines economic activity areas

The initiative sets the main concentration of economic activities around the county industrial park "The Saladar", while most areas are covered commercial or industrial contaminants in non-traditional spaces in these activities, including access from the motorway -7 on the road to Mazarron, N-340 at the height of Lebor and La Costera.

It is also proposed to create a "special license" linked to economic activity to enable the implementation of an activity in any part thereof, provided it meets certain minimum technical initially.

The joint holds the interest of safeguarding the natural and cultural wealth Totana, ensure sustainable use of natural heritage, protect biodiversity and the local historical heritage, and ensure economic and social progress of the municipality for the coming decades.

The corporate has approved to issue the guidelines for the future economic and urban development to the technicians of the Department of Planning and the Ministry of Urban and Regional Planning for making compliance and incorporation into the document.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.