Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

(05/05/2017)

The General Directorate of Highways has completed work this week to repair and refurbish the section of the highway H-C7 of La Huerta, on the outskirts of the town, which recorded significant material damage as a result of the rainy season in December and forced To cut a section of the road for months.

In January, the General Direction of Roads processed the contracting of the works in order to respond to a problem that has been dragging since the end of last December.

The actions were carried out at kilometer 0.1, at the level of the Mission Cross, just outside the town center, and basically included the construction of a retaining wall of the firm that collapsed during the rainy season And that caused a sinking in the road, impeding the circulation by the left lane.

The emergency works consisted of the reconstruction of a wall on that road linking Totana with La Bastida, in order to guarantee road safety in this area of ​​the road;

And have been undertaken by the mercantile "José Díaz García, SA" and had a budget of 85,882.06 euros.

This fact had forced to keep the road of the Huerta cut to the traffic during the period of time that the actions in the communication with the urban helmet have lasted, but already it is open definitively to the traffic.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.