Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

In the next few days, the installation work of a potable water distribution pipeline will begin next to the La Santa ravine, in the Tirol Camilleri district (05/07/2019)

The Department of Water and Sewerage will begin in the next few days the installation works of a potable water distribution pipeline next to the La Santa ravine, in the Tamil Camilleri neighborhood, which will execute the commercial "Instalaciones Hergasa 2006, SL" by amount of 9,314.34 euros.

A total of 11 construction companies were submitted to the bidding process for this contract through summary simplified procedure.

The distribution of drinking water networks in the urban area consists of a mesh of pipes that supply all the established properties.

In addition to this, networks start radially from the urban area to supply plots that are located in the lower areas of the aforementioned urban area.

These radial networks, of very old construction, have raffled all the existing infrastructures in the territory, such as the railroad, the Commonwealth channel of the Taibilla Channels, ramblas, roads and highways.

At the same time, these have, in some sections, paths that run through the interior of plots of private property, because in the past the installation of the pipes was carried out with the shortest possible length.

One of these networks suffers a breakdown inside a private plot in which there are built ships that make repair impossible, so the Municipal Water Service has left the section of pipeline without service temporarily.

This breakdown is affecting the subscribers to which it is supplied from the aforementioned network, since the provision of water that is made temporarily from another network does not cover the needs completely.

This impossibility has led to the need to install a new section of network to, as far as possible, eliminate the layout inside the private plot and put into service the supply to the network that reaches the railway.

Due to the affections that appear, the sectoral authorizations of the Mancomunidad of the Canales del Taibilla and the Segura Hydrographic Confederation have been necessary;

and given that this action is considered of public interest since it is about the supply of drinking water to citizens.

The route is located outside of private lands, with the exception of the final section, in order to safeguard the works for their maintenance;

For this purpose, the access road to the existing private estate next to the rambla has been chosen.

This is the only possible route to carry out the bypass of the damaged section, since in the northeast part of the land there is no existence of any road.

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.