Portal de Totana

www.portaldetotana.com

Totana - SpanishTotana - English
detail of Totana

 

The rural roads of Juan Teresa and Paso del Molino are cut off due to the effect of the rains registered since the beginning of the storm (19/11/2018)

The Civil Protection Meteorological Unit in Totana reports that this morning the rural roads of Juan Teresa and Paso del Molino had to be cut off due to the effects of the rains in the last hours.

In addition, on the RM-D22 road of El Raiguero, it is also necessary to proceed with caution at the intersection with the ramp of Lebor.

In the municipality of Totana have accumulated since the end of last week that began the storm a total of 137 liters per square meter in Lebor, being the area with more rainfall;

followed by 118.3 l / m2 in La Torreta and 81.4 l / m2 in the urban caco of Totana.

The rainfall recorded since yesterday afternoon in the pluviometros of the municipality until 12:00 pm today, according to the Meteorological Unit of Civil Protection are the following:

61 l / m2 Lebor

54.9 l / m2 Canal Sales

53.6 l / m2 Dam of El Paretón

42.9 l / m2 La Torreta

37.8 l / m2 Totana AEMET

35.3 l / m2 Totana La Ramblica

Source: Ayuntamiento de Totana

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Utilizamos cookies propias y de terceros para facilitar su navegación en la página web, conocer cómo interactúas con nosotros y recopilar datos estadísticos. Por favor, lee nuestra Política de Cookies para conocer con mayor detalle las cookies que usamos, su finalidad y como poder configurarlas o rechazarlas, si así lo considera.